Excel Spreadsheet

Performance Management Plan[1]

You must be logged in to download this document
Description

management performance worksheet

Reviews
Shared by:
Anonymous
Stats
views:
2835
downloads:
732
rating:
3.5(2)
reviews:
0
posted:
9/24/2007
language:
English
pages:
0
Project Plan Date of Report Name Start Date Jun 30, 2005 mnu m Not started n On Plan  Complete u Issues Client Performance Management System 10/1/04 End Date Sponsor 3/28/06 Bill Praxton, CFO Balanced Scorecard Design and Development Plan Item No Task Actual Start Date Tentative Start Date Impact on Completion (Actual vs. Target) Target Completion date & Status Comments Not Started m On Plan n Complete  Issues u Deliverables Lead 1. Refresh the Strategic Plan 1.1 1.2 1.3 1.4 Review current strategic planning documents and determine if the current plan is appropriate for the Balanced Scorecard Prepare for Strategic Planning Off-site Strategic Planning working group to develop draft revised Strategic Plan - See Planning Workshop Coordinator for more details 12/1/04 11/15/04 2/1/05 3/22/05 4/30/05 3/31/05 4/15/05 n  m m m 1) Strategic Plan booklet 2) Strategy Map Draft 1) Kick off meeting of technical group Senior Leadership approves revised Strategic After Phase 3 Plan Communicate Strategic Plan and Balanced Scorecard in printed and electronic format After Phase 3 1.5 2. Strategy Map / Strategic Plan 2.1 2.2 Preliminary Draft Map with no extras for Gap Analysis only Isolate holes / gaps between draft strategic plan vs. Draft Strategy Map Make revisions to lower level objectives in Draft Strategic Plan and fill-out Strategy Map for all components - themes, narrative addon's and complete cause-effect flows. Approval of Revised Strategic Plan and Final and Complete Strategy Map Develop Communication Plan for Strategic Plan Launch Action Plan Steps for Strategic Plan with Strategy Map Centralize feedback and comments for next planning cycle. Collect and recommend for next planning session cycle. 3/1/05 3) Very Basic Strategy Map 4) Gap Analysis Results and recommendations to fill out SPlan 5) Revised Strategic Plan 6) Revised Strategy Map May have to schedule at joint leadership off-site 2.3 2.4 2.5 7) Briefing Session 8) Communication Plan 2.6 May require meetings and other events per the Communication Plan 9) Action Plan for Communication Plan 2.7 Output from this step does not get 10) Feedback Collection acted upon until next annual planning System and Reports cycle. DRAFT Page 1 of 14 Project Plan Date of Report Name Start Date Jun 30, 2005 mnu m Not started n On Plan  Complete u Issues Client Performance Management System 10/1/04 End Date Sponsor 3/28/06 Bill Praxton, CFO Balanced Scorecard Design and Development Plan Item No Task Actual Start Date Tentative Start Date Impact on Completion (Actual vs. Target) Target Completion date & Status Comments Not Started m On Plan n Complete  Issues u Deliverables Lead 3. Measurements and Targets 3.1 Create measurement and target development workplan complete with templates and methodology Quality control review to refine and improve complete measurement approach for client Extend each objective on the Strategy Map into one to three performance measurements Solicit input and feedback from functional leads and line and staff personnel Establish a set of targets in accordance with operational goals that are linked to the Strategic Plan Identify initiatives and projects related to execution of each objective. Extend the Map Prototype test Scorecard Model for data points that use existing measurement data Complete a comprehensive measurement template for database development Make sure model is tight / fits across all components Performance measurement development template 11) Performance measurement training, tools, methodology Final set of tools to development enterprise wide performance measurements Follow the methodology and training Revised set of performance measurements Targets for each measurement Scorecard Model 3.2 3.3 3.4 3.5 3.6 3.7 3.8 4. Initiative Mapping and Budgeting 4.1 Extend Initiative and Projects that are part of Scorecard Model into Action Plans or document with existing plans Link the Initiative / Projects within the Scorecard Model to the Budgeting Process Identify gaps and short coming with linking and make recommendations to improve Recommended Changes to Link Processes Together Extended Scorecard Model ensures execution of the Strategic Plan Extended Scorecard Model 4.2 4.3 DRAFT Page 2 of 14 Project Plan Date of Report Name Start Date Jun 30, 2005 mnu m Not started n On Plan  Complete u Issues Client Performance Management System 10/1/04 End Date Sponsor 3/28/06 Bill Praxton, CFO Balanced Scorecard Design and Development Plan Item No Task Cross walk all major initiatives against the Strategic Objectives - Pareto Chart the initiatives / projects Work back upstream from initiatives / projects not linked and document any missing lower level objectives in strategic plan and / or strategy map Actual Start Date Tentative Start Date Impact on Completion (Actual vs. Target) Target Completion date & Status Comments Not Started m On Plan n Complete  Issues u Deliverables Lead 4.4 Graph of what should get resourced vs. what should not Operating Plan / Sub Objective Additions 4.5 5. Reporting Framework (Database) 5.1 Map and build a framework structure from the highest organizational level down to the managerial level Align and link lower level components by through objective setting - upper to lower by organizational level / reporting units Assign performance measurements for lower level objectives. Index across common reporting units for the same objective. Complete a comprehensive measurement template for database development for this reporting level (lower objectives) NOTE: The IT Design and Various automated tools, such Development Plan covers automation as data collection forms, of the Enterprise Strategic reporting tools, etc. Management System See other similar models from other performance management projects Visual prototype framework for review 5.2 5.3 5.4 5.5 Prototype test and revise database design of Balanced Scorecard System - (ESMS 5.6 5.7 Roll out test modules at pilot sites - flush out lessons learned and update IT Plans Cascade and development plan for Enterprise Strategic Management System (ESMS) ESMS Design and Development Plan Baseline End Date 3/28/06 Status Major Issues Item No. Description Comments DRAFT Page 3 of 14 Project Plan Date of Report Name Start Date Jun 30, 2005 mnu m Not started n On Plan  Complete u Issues Client Performance Management System 10/1/04 End Date Sponsor 3/28/06 Bill Praxton, CFO Balanced Scorecard Design and Development Plan Item No Task Actual Start Date Tentative Start Date Impact on Completion (Actual vs. Target) Target Completion date & Status Comments Not Started m On Plan n Complete  Issues u Deliverables Lead 1 2 3 4 DRAFT Page 4 of 14 All Measurements Used in the ESMS Database PM # Performance Measure BSC Framework Strategic Goal or Objective per Major Organizational Unit BSC or Strategic Plan Function / Dept / Sub Group Service or Product Line (if applicable) Type of Measure Measure Justification Definition Data Elements To Be Collected Data Source Data Collection Frequency D/W/M/Q/SA/A PM Calculation Formula Actual FY 03 Definition What is the PM number for What metric(s) should we use to referencing. Could be LMR # or measure whether we have met our a unique number for local requirements? metrics? Is this measure a Customer, Process, Learn & Grow or Resources measure based on the BSC framework? Insert major goals or objectives in this box as a reference in completing this template Insert a list of the major organizational unit names in this box for reference in completing this template Insert a Link here to reference back a list of Functions / Departments and other organizational units in completing this template Insert the Operating Area such as Product or Service Line - To be used for Product Performance Analysis Is this measure a 1) Strategic 2) Operational 3) Tactical 4) Individual Why are we using this metric? How do we define this measure? What are the data elements Where does the data for caclulating the measure? reside? How frequently should the data be collected? What is the formula for calculating the measure? What is the actual result of this measure for the Year 2003? 1 2 3 4 5 6 5 of 14 All Measurements Used in the ESMS Database PM # Performance Measure Actual FY 04 Green Standard Amber Standard Red Standard Primary Functional POC Data Available? Notes Definition What is the PM number for What metric(s) should we use to What is the actual referencing. Could be LMR # or measure whether we have met our result of this measure a unique number for local requirements? for the Year 2004? metrics? What is the Green Threshold? What is the Amber What is the Red Threshold? Threshold? Who is the primary owner for the measure and their email address? Y/N Are there any additional notes regarding the measure? 1 2 3 4 5 6 6 of 14 Review and score all measurements used in your scorecard model F1.1 F1.2 F1.3 F1.4 F2.1 F2.2 F2.3 F2.4 F3.1 F3.2 F3.3 F3.4 C1.1 C1.2 C1.3 C1.4 C2.1 C2.2 C2.3 C2.4 P1.1 P1.2 P1.3 P1.4 P2.1 P2.2 P2.3 P2.4 P3.1 P3.2 P3.3 P3.4 P4.1 P4.2 P4.3 P4.4 L1.1 L1.2 L1.3 L1.4 L2.1 L2.2 L2.3 L2.4 % Revenue Growth Graded Attributes Balanced Scorecard Project Quality Review of Metrics 4 Degree of Reliability (Hard Data vs.Subjective) 4 Financial Objective (F1) Financial Objective (F2) Financial Objective (F3) Customer Objective (C1) Customer Objective (P2) Process Objective (P1) Process Objective (P2) Process Objective (P5) Process Objective (P4) L & G Objective (L1) L & G Objective (L2) Update Frequency / Repeatable L & G Objective (L3) L3.1 L3.2 L3.3 L3.4 Instructions: Rate each Measurement for these attributes on a scale of 1 to 5: 1. Update Frequency: Measurement can get updated on a regular basis; M for Monthly, Q for Quarterly, A for Annual, etc. 2. Degree of Reliability: Can you easily measure the performance objective or is it too subjective when it comes to measurabilit 3. Encourages the right behavior: Measurements should not confuse, distort, or create the wrong performance behavior within 4. Degree of Fit: Measurement fits with the culture and processes of Organization and flows well from Lower Level to Upper Le 5. Degree of Support: Client has existing procedures and processes that can support the measurement (such as available data Maximum Score 25 Degree of Support / Available Info Leading or Lagging Degree of Fit with Client's Culture Encourages the right behavior Total Points 5 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Overall Grade 80% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 3 4 Lagging Single Single or Index Metric NonGraded Attributes 0 0 0 0 0% 0% 0% 0% Quarterly, A for Annual, etc. ve when it comes to measurability. ong performance behavior within the Organization. Controllable? ell from Lower Level to Upper Level. (MACRO FIT - ORGANIZATIONAL) surement (such as available data is in place) M H M M Alignment Matrix Vision Mission Values Strategic Drivers Organization Measures Critical Levers Critical Processes Measures Tools Project Roster Name Area Location Desk Phone Project Intranet Web Site ► www.intranets.com Cell Phone Email

Related docs
Plan 1
Views: 7  |  Downloads: 3
Performance Management
Views: 5  |  Downloads: 0
Performance Management
Views: 1  |  Downloads: 0
A Business Plan 1
Views: 20  |  Downloads: 2
project management plan[1]
Views: 2503  |  Downloads: 225
Project Management Plan
Views: 7257  |  Downloads: 1184
Sample DC Performance Plan
Views: 72  |  Downloads: 1
Performance Standards Changes to Plan
Views: 47  |  Downloads: 3
The Performance-Based Management Handbook
Views: 15  |  Downloads: 3
Interoperability Performance Management
Views: 3  |  Downloads: 1
Management and Performance
Views: 129  |  Downloads: 9
Book Performance Management
Views: 0  |  Downloads: 0
premium docs